WPK-BUTTON_01_01WPK-BUTTON_01_02WPK-BUTTON_01_03WPK-BUTTON_01_04WPK-BUTTON_01_05WPK-BUTTON_01_06

Friday 16 August 2013

SOMETHING TO LOOK FORWARD TO...


PHASE 1 CONSTRUCTION PROGRESS


At the moment the construction team is busy with the following exciting construction projects;
  •      The roof for the new Woolworths and Truworths shops are being fitted.
  •      The Woolworths shell is almost completed.
  •      The pillars and slabs for the deck parking are being casted.
  •      The shop fronts are being fitted where the existing tenants have moved out.
  •      The next step in this phase will be installing the roof sheeting and building the shells of the restaurants. 


MOVERS & SHAKERS INSIDE THE CENTRE:
  • Mattress Zone has moved and is now trading from their shop at the FNB entrance.
  • The existing Vodacom 4U store has moved and is trading from their temporary store next to Verimark.
  • Crazy Store is the first tenant to open in a brand new shop built from the foundations to the roof!
  • Maxis have closed down and will open for trade end of October in the brand new food court area.
  • The FNB, Standard Bank and Nedbank ATM’s situated at Entrance 6 have been removed.
  • The temporary ATM’s are at the various entrances. 
  • Cell C has moved into their brand new shop next to the old Crazy Store.



PARKING:
The basement parking is still scheduled to open in October 2013 and will include
700 new parking bays.


ROAD UPGRADES:
The contractors will start with the following upgrades in the next 3 months:
  • Upgrading of the road at the main entrance to the centre.
  • Building of the delivery exit for Builders Express.